| All Current Incidents. |
| Closure - Interstate 29 |
Interstate 29 northbound: at Exit 53B: I-480 bridge closed, exit ramp closed, road construction -- detour in operation, follow the detour signs — starting 7:00 AM, 07/08/09 until October 26 Comment: Pottawattamie County. I-29 to I-480 ramp will be closed during construction. This is the ramp from I-29 nroth to I-480 west. This is a bridge deck overlay project. There is a detour associated with this closure. It starts at exit 53B of I-29 north bound, then north and east to exit 55 on I-29 north bound which is the 25th Street exit, then under the I-29 overpass to I-29 south bound, then back on I-29 south bound, then south and west to the I-480 west exit off I-29. The Council Bluffs Resident Construction Engineer will administer this project. Phone: 1-800-579-2719. last updated June 30 |
| |
| Closure - Interstate 80 |
Interstate 80 eastbound: at Exit 306: US 67 road closed because bridge inspection work is in progress — Comment: I-80 eastbound has been closed at the Mississippi River Bridge. Use either I-280 or I-74. Unknown how long bridge will be closed. last updated May 20 |
| |
| Closure - US 6 |
US 6 in both directions: from County Road V16 to County Road V18 road closed to traffic — until October 9 Comment: Poweshiek County. US 6 will be closed June 22 for the reconstruction of the Bear Creek bridge located 4.0 miles East of US 63 between Poweshiek County roads V 16 and V 18. Detour will use US 63, I-80 and IA 21. Road is expected to reopen October 9, 2009. Marshalltown RCE Office 1-800-251-2706. last updated June 19 |
| |
| Closure - US 52 |
US 52: from County Road X47 to IA 128 road closed to traffic, festival, parade on Saturday — starting 8:30 AM, 07/04/09 until tomorrow at about 11:00 AM CDT Comment: Clayton County: The City of Garnavillo is having a parade in celebration of the Fouth of July. Detour set up by the city. For further information contact Kathie Rustad at 382-3631. last updated June 29 |
| |
| Closure - US 218 |
US 218: from IA 9; County Road T46 to County Road A43 road closed to traffic, festival, parade on Saturday — starting 8:45 AM, 07/04/09 until tomorrow at about 10:30 AM CDT Comment: Mitchell County: The City of Osage is having a parade in celebration of the Fourth of July. Detour set up by the city. For further information contact Kathie Rustad at 382-3631. last updated June 29 |
| |
| Closure - Iowa 9 |
Iowa 9: from County Road T26 to US 218 road closed to traffic, festival, parade on Saturday — starting 8:45 AM, 07/04/09 until tomorrow at about 10:30 AM CDT Comment: Mitchell County: The City of Osage is having a parade in celebration of the Fourth of July. Detour set up by the city of Osage. For further information contact Kathie Rustad at 382-3631. last updated June 29 |
| |
| Closure - Iowa 14 |
Iowa 14 in both directions: from US 6 to IA 224 road closed to traffic, bridge construction — until August 7 Comment: Jasper County. Bridge replacement over Snipe Creek on IA 14 1.1 miles East of West Junction of County Road F-17 will result in closing a portion of IA 14. Detour will be I-80 at the junction of IA 14 East to the IA 224 junction then North and West to the IA 14 junction. Marshalltown RCE Office 1-800-251-2706 last updated March 10 |
| |
| Closure - Iowa 24 |
Iowa 24: at US 18 road closed to traffic -- follow local detour — until October 30 Comment: Chickasaw County. IA 24 in New Hampton from Linn Avenue east to just east of Water Avenue is closed for reconstruction. Traffic will be routed in New Hampton on Milwaukee Street and N. Pleasant Hill Avenue. Please follow detour route signs and use caution when travelling the local city detour streets. New Hampton RCE Office - 800-373-7343. last updated May 11 |
| |
| Closure - Iowa 76 |
Iowa 76: from US 18 to US 18 road closed to traffic, parade on Saturday — starting 10:00 AM, 07/04/09 until tomorrow at about 11:00 AM CDT Comment: Clayton County: The City of Marquette is having a parade in celebration of the Fourth of July. Detour set up by the city. For further information contact Kathie Rustad 382-3631. last updated June 29 |
| |
| Closure - Iowa 78 |
Iowa 78: between IA 1 and County Road V51 bridge closed due to bridge construction work Comment: Bridge closed at Coppock on IA 78. Detour for eastbound traffic. Take IA 1 at Brighton north to Washington then IA 92 east to county road W55 south onto W47 to IA 78. For westbound traffic. Go north at intersection IA 78 and county road W47. County road turns into W55. Then go West on IA 92 in Washington to IA 1 South to Brighton and turn onto IA 78 West. Jeff Johnson. RCE. 1-800-224-6021. last updated October 5 |
| |
| Closure - Iowa 92 |
Iowa 92 in both directions: from I-29 to US 59 road closed, road construction, bridge construction -- detour in operation, follow the detour signs — until October 2 Comment: Pottawattamie County. This road closure is for two bridge replacements. One bridge is 0.1 miles west of Treynor, IA and the other bridge is 2.7 miles west of Treynor, IA. IA 92 west of Treynor will be closed to thru traffic. There will be a detour in effect which goes north from Treynor on County Road L-55 four miles to US 6, then West on US 6 nine miles to the I-80 / US 6 interchange, then southwest on I-80 to the I-29 / I-80 east interchange, then south 1.0 miles on I-29 to the I-29 / IA 92 interchange. The Council Bluffs Resident Construction Construction Engineer will administer these projects. Phone 1-800-579-2719 last updated March 30 |
| |
| Closure - US 34 |
US 34 southbound: between Exit 210 IA 904 and Exit 212: IA 1 bridge closed, bridge construction daily — until September 30 Comment: Jefferson County. Bridge Reconstruction. This is on Old US 34 West of Fairfield over Shirtz Creek 3.2 mi. west of Ia. 1 and on Old US 34 over MItchell Creek 1.5 Mi. W. of Fairfield. Access into Fairfield from the US-34 bypass at Exit 210 will be closed to replace bridges over both creeks. Local traffic will use exit 212 at Iowa 1 when traveling on US 34.Mt. Pleasant RCE.1-800-224-6021. last updated May 1 |
| |
| Closure - US 61 |
US 61: at US 34 road closed, bridge construction -- use a detour where possible daily — until September 1 Comment: Des Moines County.Bridge Deck Overlay. This is the 4th Street bridge over US 34 in Burlington. This bridge will be closed. Traffic wii need to detour to 5th street.High Street & Arch Street will remain open. Mt. Pleasant RCE. 1-800-0224-6021. last updated April 20 |
| |
| Closure - Iowa 3 |
Iowa 3: at US 169 bridge closed -- detour in operation, follow special detour markers — until November 25 Comment: Humboldt County - Bridge 1.6 miles west of US 169 closed for reconstruction. Detour starts at County Road P33. North on P33 two miles to C29, east on C29 for approximately 3 miles to Iowa 169, and south on Iowa 169 for two miles back to Iowa 3. Cherokee RCE 1-800-579-2712 last updated April 16 |
| |
| Closure - Iowa 3 |
Iowa 3: at County Road X21 road closed to traffic -- detour in operation — starting 7:00 AM, 07/06/09 until July 17 Comment: Delaware County: Beginning July 6, 2009 Ia. 3 will be closed to all traffic approximately 350 ft. east of County Road X-21 for culvert replacement. A detour will be in effect for approximately two weeks using Ia. 13, Co. Rd. C-64, 200th Avenue, and Laser Road. Project STPN-3-8 --2J-28 Manchester RCE 1-800-262-5146 last updated July 1 |
| |
| Closure - Interstate 29 |
Interstate 29 northbound: at Exit 71: I-680 exit ramp closed — starting 6:00 AM, 07/06/09 until July 10 Comment: Pottawattamie County: Bridge Painting will result in ramp closures from Interstate 29 to eastbound Interstate 680 near Loveland the week of July 6. The work involves painting of the railroad bridge over I-680 at milepost 13, just east of I-29. Due to the proximity of the ramps to the overhead bridge, the ramp from I-29 Northbound to I-680 Eastbound will need to be closed for a few days to complete the painting. Weather permitting, starting Monday, July 6, the I-29 Northbound to I-680 Eastbound ramp will be closed. Traffic will be routed north on I-29, less than a mile to the Loveland exit, then back south on I-29 to utilize the I-29 Southbound to I-680 Eastbound ramp. Motorists are encouraged to utilize alternate routes, be alert while traveling in the work area, and to slow down and observe signs. Contact: Orest Lechnowsky 712-366-0568 last updated June 29 |
| |
| Closure - US 69 |
US 69: from after County Road B14 to before IA 9 roadway reduced to one lane — until July 15 Comment: Winnebago County: Lane closure - Outside Northbound Lane on Hwy 69 from milepost 205.00 to 205.32 beginning at 8:00 am on 6/2/09 till 4:30 pm on 7/15/09. For further information contact Scott Loge, Supervisor, 641-923-2305 last updated June 3 |
| |
| Closure - Iowa 4 |
Iowa 4 in both directions: from after County Road B14 to IA 9 road closed to traffic -- follow local detour. Expect 5 - minute delays. — until September 30 Comment: Emmet County. Reconstruction - Closed to traffic on IA 4 from the south city limits to IA 9 in the town of Estherville. Traffic to follow local detour on South 1st Street and IA 9. Roy A. Gelhaus, Britt Construction Office 1-800-373-7344. STPN-004-6 - -2J-32 last updated April 24 |
| |
| Closure - Iowa 9 |
Iowa 9: from IA 60 to US 59 road closed to traffic, road construction -- detour in operation — until October 15 Comment: Osceola County - Road closed to thru traffic. Detour begins at Iowa 60 Sibley bypass. South on Iowa 60 Sibley bypass to A22, then east on A-22 to L-58, then north on L-58 through Ocheyedan back to Hwy. 9. Cherokee RCE 1-800-579-2712 last updated May 22 |
| |
| Closure - Iowa 9 |
Iowa 9: from after US 69 to before County Road R74 roadway reduced to one lane — until July 15 Comment: Winnebago County: Lane Closure - Outside Westbound Lane - Hwy 9 from milepost 158.52 to 158.92 beginning at 8:00 am on 6/2/09 till 4:30 pm on 7/15/09. For further information contact Scott Loge, Supervisor, 641-923-2305. last updated June 3 |
| |
| Closure - Iowa 12 |
Iowa 12 in both directions: at I-29 exit ramp closed, entrance ramp closed daily — until September 25 Comment: Woodbury County. The Interchange at IA 12 and I-29 a will be closed Monday July 6th to facilitate the grading and paving of the new I-29 & IA 12 Interchange. Traffic will be detoured north on IA 12 to Military Road and north on Military Road to River Drive Road and west on River Drive Road back to I-29. Sioux City RCE 1-800-579-2713. last updated June 30 |
| |
| Roadwork - Interstate 29 |
Interstate 29 in both directions: from Exit 35: US 34; US 275 to Exit 42: IA 370; County Road H10 road construction, bridge construction — until November 16 Comment: Mills County. The southbound lane will be closed for a hot mix asphalt overlay plus the construction of a new bridge. This closure will start approximately three miles north of the north junction of I-29 and US-34, exit 35, north to the Pottawattamie County Line, approximately three miles north of the IA-370 interchange, exit 42. The traffic will be in a head-to-head situation in the north bound lanes of I-29. The Council Bluffs Resident Construction Engineer will administer this project. Phone: 1-800-579-2719 last updated April 20 |
| |
| Roadwork - Interstate 35 |
Interstate 35 in both directions: from after Exit 36: IA 152; County Road R35 to Exit 56: IA 92 road construction, roadway reduced to one lane, width limit in effect Width limit 14 ' 0 " — until July 31 Comment: Warren County: Reconstruction under bridges at mileposts 43, 47, 49, 52 on I-35 northbound and southbound lanes. Chariton RCE Office 1-800-881-5778. last updated June 12 |
| |
| Roadwork - Interstate 35 |
Interstate 35: from after Exit 137: I-80 to before Exit 151 County Roads C70 and R75 road construction, night time construction work, roadway reduced to one lane — starting 7:00 PM, 07/06/09 until September 15 Comment: This project is patching from NE Mixmaster north to Wright Co. line from 7pm Monday night to 6:30 am Friday and 9 pm Sunday night to 6:30 am Monday. One lane will be closed while patching work is being done. There will be a patching on I-35 from MP 114.5 to Wright Co. line days from 7 am to 8 pm with lane closure while patching is being completed. There will be no lane closures left up outside of the working hours given. Des Moines Construction Greg Mulder 1-800-251-2707 last updated June 26 |
| |
| Roadwork - Interstate 74 |
Interstate 74 in both directions: between Exit 1 53rd Street and East 53rd Avenue and Exit 2: US 6; Spruce Hills Drive bridge construction, night time construction work, roadway reduced to one lane, road closed intermittently, delays daily — until December 31 Comment: Scott County, Lincoln Road Bridge Replacement over I-74, 1.6 miles W. of the Mississippi River in Bettendorf. Lincoln Rd. will be closed to all traffic and diverted to local roads. Lane closures permitted on I-74 from 7 PM to 6 AM Monday through Friday. Deceleration/Acceleration lanes may be closed 9 AM to 3 PM. There will also be 20 minute TOTAL CLOSURES Intermittently between the normal restricted hours.. Davenport Construction, 1-800-262-5145. last updated April 20 |
| |
| Roadwork - Interstate 80 |
Interstate 80 in both directions: from Exit 54: IA 173 to Exit 70: IA 148; County Road F58 bridge construction, roadway reduced to one lane, width limit in effect, speed restrictions in force Width limit 16 ' 0 ", Advisory speed limit 55 MPH — until August 31 Comment: Cass Co., Creston Construction 800-579-2720, Head-to-head traffic, one lane in each direction in the WB Lanes. Construction located between Mile Post 59 to Mile Post 61. last updated March 24 |
| |
| Roadwork - Interstate 80 |
Interstate 80 in both directions: from Exit 70: IA 148; County Road F58 to Exit 86: IA 25 road construction, roadway reduced to one lane, width limit in effect Width limit 16 ' 0 " — until August 31 Comment: Adair Co., Creston Construction 800-579-2720. traffic will be head-to-head in the EB lanes near Mile Post 76. Exit 75 will be closed during construction. Traffic is advised to use Exit 76. last updated March 25 |
| |
| Roadwork - Interstate 80 |
Interstate 80: from after Exit 149 County Road S27 to before Exit 205 County Road V38 road construction, night time construction work, roadway reduced to one lane — starting 12:00 AM, 07/06/09 until September 15 Comment: This patching project is from Jasper Co. line to Iowa Co. line. There will be one lane closed during working hours given, however no lane closures will be up when no work is being completed. There will be no work on I-80 from July 6th to Sept 7th between 6 am and 9 pm. Des Moines Construction Greg Mulder 1-800-251-2707 last updated June 26 |
| |
| Roadwork - Interstate 80 |
Interstate 80 in both directions: at Exit 267: IA 38; County Road X54 road construction, night time construction work, roadway reduced to one lane, width limit in effect, delays Width limit 14 ' 0 " daily — until July 30 Comment: Cedar County, Construction of New Bridge Approaches on the Cedar River Bridge 1 Mile W. of the W. Jct. IA 38. Lane Closures will be allowed from 7 PM to 11 AM. No lanes will be closed during IOWA FOOTBALL GAMES. Davenport Construction, 1-800-262-5145. last updated June 26 |
| |
| Roadwork - Interstate 80 |
Interstate 80 in both directions: at Exit 271: US 6; IA 38 and County Road X64 road construction, roadway reduced to one lane daily — until July 15 Comment: Cedar County, Painting on bridge over I-80. 2 miles W. of IA 38. The painting schedule is Monday thru Thursday 7 PM to 6 AM, Friday 10 PM to 6 AM, Saturday 10 PM to 9 AM and Sunday 10 PM to 6 AM. Davenport Construction, 1-800-262-5145. last updated May 22 |
| |
| Roadwork - Interstate 80 |
Interstate 80 westbound: at Exit 292: IA 130; North West Boulevard road construction, night time construction work, roadway reduced to one lane, ramp restrictions in force, width limit in effect, delays Width limit 12 ' 0 " on weekdays and Saturdays — until November 28 Comment: Scott County, There will be lane closures during night time hours only, beginning June 18. Lane closures will be from 7:00 PM to 6:00 AM each night Monday thru Thursday, beginning at 7:00 PM Monday and ending at 6:00 AM Friday. Lane closures on WB I-80 will also be permitted on Sunday night from 9:00 PM to 6:00 AM Monday. Also WB Ramp reconfiguration. Davenport Construction, 1-800-262-5145. last updated June 8 |
| |
| Roadwork - Interstate 280 |
Interstate 280 in both directions: from after Exit 1: US 6 to after Exit 8: IA 22; Rockingham Road road construction, roadway reduced to one lane daily — until August 21 Comment: Scott County, Painting on IAIS Railroad Bridge 2.4 Miles E. of I-80. The painting schedule is Monday thru Thursday 7 PM to 6 AM, Friday 10 PM to 6 AM, Saturday 10 PM to 9 AM and Sunday 10 PM to 6AM. Davenport Construction, 1-800-262-5145. last updated June 29 |
| |
| Roadwork - Interstate 380 |
Interstate 380: from Exit 239: I-80 to Exit 17 33rd Avenue road construction, night time construction work, roadway reduced to one lane, width limit in effect Width limit 14 ' 0 " — until July 31 Comment: Linn County: Night time work on I-380 from I-80 to the 33rd Avenue exit in Cedar Rapids will begin April 21. One lane will be closed in either direction through the work areas. The hours of work will be 8:00 pm Sunday evening to 6:00 am Monday morning; 7:00 pm Monday evening to 7:00 am Tuesday morning; 8:00 pm to 7:00 am Tuesday evenings through Friday mornings; 8:00 pm Friday evening to 11:00 am Saturday morning; and from 7:00 pm Saturday evening to noon Sunday. Width restriction is 14 ft. with 10 ft paved outside and 6 ft paved inside shoulder. A daytime lane closure in either direction Monday through Thursday 11:00 am to 3:00 pm is also in effect from the Center Point interchange north to Ia. 150 for guardrail work. Manchester RCE 1-800-262-5146 IM-380-6 --13-52 last updated July 1 |
| |
| Roadwork - US 6 |
US 6 in both directions: from I-280 to US 61 road construction, roadway reduced to one lane, width limit in effect, delays -- pilot car in operation, look out for flaggers Width limit 10 ' 0 " on weekdays and Saturdays — until August 31 Comment: Scott County, Asphalt Pavement widening & Resurface in Davenport from Fairmont St. NE to I-280. Davenport Construction, 1-800-262-5145. last updated April 21 |
| |
| Roadwork - US 20 |
US 20: from US 59 to IA 110 road construction, roadway reduced to one lane -- pilot car in operation — starting 7:00 AM, 07/06/09 until August 25 Comment: Ida County - One-lane traffic will be maintained with a pilot car operation in alternating areas where contractor is working. Cherokee RCE 1-800-579-2712 last updated June 25 |
| |
| Roadwork - US 20 |
US 20: at US 71 road construction, roadway reduced to one lane — until July 10 Comment: Sac County - just east of U.S. 71 over drainage ditch traffic may be reduced to one lane at times. Cherokee RCE 1-800-579-2712 last updated June 5 |
| |
| Roadwork - US 20 |
US 20: at US 71 road construction, roadway reduced to one lane — until July 10 Comment: Sac County - just west of U.S. 71 over drainage ditch one lane may be closed at times. Cherokee RCE 1-800-579-2712 last updated June 5 |
| |
| Roadwork - US 20 |
US 20: at IA 4 road construction, roadway reduced to one lane — until July 10 Comment: Sac County - on U.S. 20 3.4 miles west of the Webster county line at East Cedar Creek - traffic may be reduced to one lane at times. Cherokee RCE 1-800-579-2712 last updated June 5 |
| |
| Roadwork - US 20 |
US 20: from Exit 254: IA 150; 3rd Avenue Southeast to Exit 266: IA 187 road construction, roadway reduced to one lane, width limit in effect Width limit 12 ' 0 " — until July 10 Comment: Buchanan County: On US 20 from 1.5 miles west of Independence east to Ia. 187, patching work will close one lane in either direction through the work area. Width restriction is 12 ft with 10 ft granular outside and 6 ft granular inside shoulder. Project MP-20-6 245--76-10 Manchester RCE 1-800-262-5146 last updated June 25 |
| |
| Roadwork - US 30 |
US 30: from US 71 to IA 25; County Road N65 road construction, roadway reduced to one lane -- pilot car in operation — until July 24 Comment: Carroll County - From the east side of Carroll east to 3.5 miles east of Glidden traffic will be reduced to one lane in work areas and traffic will be maintained with a pilot car operation. Cherokee RCE 1-800-579-2712 last updated June 24 |
| |
| Roadwork - US 30 |
US 30: at County Road P33 bridge construction, width limit in effect, roadway reduced to one lane Width limit 11 ' 6 " daily — until August 4 Comment: Greene County Bridge Deck overlay project Buttrick Creek , width restriction of 11'6" on US 30 near intersection of P-33 one lane bridge with temporary barrier rail and traffic lights during construction period Jefferson RCE 1-800-251-2705 last updated June 4 |
| |
| Roadwork - US 30 |
US 30: from US 151 to I-380 road construction, night time construction work, roadway reduced to one lane, width limit in effect Width limit 14 ' 0 " — until July 31 Comment: Linn County: Beginning April 23 on Hwy. 30 between Stoney Point Road and Edgewood Road road patching work will reduce traffic to one lane in the eastbound and westbound lanes during daytime and night time hours. From Edgewood Road to Kirkwood Boulevard road patching work will reduce traffic to one lane in the eastbound and westbound lanes during the nighttime hours of 7:00 pm to 6:00 am, Monday evening through Friday morning and from 9:00 pm Sunday evening to 6:00 am Monday morning. Width restriction is 14 ft. with a 10 ft. paved outside, and 6 ft. paved inside shoulder. Project NHSX-30-7 --3H-57 Manchester RCE 1-800-262-5146 last updated May 29 |
| |
| Roadwork - US 34 |
US 34 in both directions: at US 63 bridge construction, roadway reduced to one lane, width limit in effect Width limit 12 ' 0 " — until July 26 Comment: Wapello County: Bridge construction, reduced to one lane, on US 34 starting before Church St. and ending after Bardell St. in the eastbound/westbound lanes. Width limit of 12" in effect. Chariton RCE Office 1-800-881-5778. last updated June 25 |
| |
| Roadwork - US 34 |
US 34 in both directions: between Exit 210 IA 904 and Exit 212: IA 1 road construction, night time construction work, width limit in effect, roadway reduced to one lane -- look out for flaggers daily — until September 7 Comment: Jefferson County. HMA Resurfacing with Milling. This will be on Old US 34 in Fairfield from WCL to ECL . This will also be from Filbert Rd. to 32nd St. & from Glasgow Rd. to Nutmeg Ave.. There will be some night -time work that will be taking place in order to keep business disruptions to a minimum. There will be 11 ft. width restrictions. There will also be flaggers and also lane closures. Mt. Pleasant RCE.1-800-224-6021. last updated April 14 |
| |
| Roadwork - US 34 |
US 34: at Exit 261: US 61 bridge construction, roadway reduced to two lanes, width limit in effect, exit ramp closed, entrance ramp closed Width limit 12 ' 0 " daily — until September 1 Comment: Des Moines County. This is a bridge deck overlay and approach repairs.There will be lane closures on Hwy . 34 at Exit 262B - Central Ave. with 12' Lane width restrictions on mainline. EB off ramp at Exit 262B will be closed. WB on ramp at same location will be closed.Mt. Pleasant RCE. 1-800-224-6021. last updated April 20 |
| |
| Roadwork - US 52 |
US 52: from IA 3 to IA 128 road construction, roadway reduced to one lane, width limit in effect -- pilot car in operation, look out for flaggers — until July 10 Comment: Dubuque County: Beginning April 20 on Hwy 52 from Luxemberg to the south city limits of Guttenberg, highway milling and resurfacing work will reduce traffic to one lane through the work areas. Traffic will be controlled using flaggers and a pilot car. Width restriction is 10 ft. with variable granular shoulder width of 6 ft. to 10 ft granular. Expect Delays. Project STPN-52-2 --2J-31 Manchester RCE 1-800-262-5146 last updated June 26 |
| |
| Roadwork - US 52 |
US 52: at County Road C43 road construction, roadway reduced to one lane -- pilot car in operation, look out for flaggers — until July 24 Comment: Clayton County. Road construction involving clearing and grubbing near north city limits of Guttenberg will require intermittent lane closures. Traffic will be maintained with flaggers and pilot car. Please use caution when traveling through the work zone. New Hampton RCE - 800-373-7343. last updated June 25 |
| |
| Roadwork - US 59 |
US 59: at US 20 road construction, roadway reduced to one lane, width limit in effect Width limit 14 ' 0 " — until August 1 Comment: Ida County - On Hwy. 59 over a small stream one-half mile north of Holstein traffic will be reduced to one lane with an on-site detour controlled with traffic signals. Width limit is reduced to 14 foot pavement width. Cherokee RCE 1-800-5792712 last updated May 18 |
| |
| Roadwork - US 61 |
US 61 in both directions: at IA 78; County Road H22 road construction, roadway reduced to one lane, width limit in effect -- look out for flaggers Width limit 12 ' 0 " daily — until August 20 Comment: Des Moines County.HMA Resurfacing with Milling.This will run from 0.4 mile S. of Flint River Bridge N. of Burlington N. to SCL Mediapolis. This will also run from SCL Mediapolis N. to Just S. of Louisa Co. Line. There will be 12ft width restriction. There will also be flaggers on this project. Road will be restored to two lanes when workers are not present.Mt. Pleasant RCE. 1-800-224-6021. last updated April 16 |
| |
| Roadwork - US 61 |
US 61 in both directions: from IA 64 to County Road E17 road construction, roadway reduced to one lane, width limit in effect Width limit 12 ' 0 " on weekdays and Saturdays — starting 6:00 AM, 07/13/09 until August 7 Comment: Jackson County, Asphalt Resurfacing at Various locations on US 61 from Maquoketa northerly 7 miles. Davenport Construction 1-800-262-5145. last updated June 29 |
| |
| Roadwork - US 61 |
US 61: at US 151 road construction, roadway reduced to one lane, width limit in effect Width limit 14 ' 0 " on Tuesdays — until September 25 Comment: Dubuque County: Bridge repair on the US 61/151 bridge over 9th Street in Dubuque will reduce traffic to one lane in either direction through the work zone. Width restriction is 14 feet with a 1 ft paved shoulder. Project BRFN-61-8 --39-31 Manchester RCE 1-800-262-5146 last updated June 12 |
| |
| Roadwork - US 65 |
US 65: from after IA 92 to before US 69 road construction, night time construction work, roadway reduced to one lane — until Sunday, at about 7:00 PM CDT Comment: This project is for patching, milling and resurfacing of US 65/69 from 1.5 miles south of NCL of Indinaola north to the IA 5 interchange both NB and SB lanes with one closed in either or both directions except for 6:30am to 8:30am NB and 4:00pm to 6:00pm SB. Des Moines Construction Greg Mulder 1-800-251-2707 last updated May 5 |
| |
| Roadwork - US 67 |
US 67: from I-74 to US 30 road construction, roadway reduced to one lane, width limit in effect, delays -- pilot car in operation, look out for flaggers Width limit 10 ' 0 " on weekdays and Saturdays — until July 20 Comment: Scott/Clinton Counties, Concrete Patching on US 67 from E. City Limits of Bettendorf NE to US 30. Davenport Construction 1-800-262-5145. last updated June 16 |
| |
| Roadwork - US 67 |
US 67: at I-74 road construction, night time construction work, roadway reduced to one lane daily — until October 1 Comment: Scott County, Bridge Painting on I-74 at the Mississippi River Bridge Approach in Bettendorf. Lane Closures will not be allowed on US 67 from 6:00 AM t0 9:00 AM and from 3:00 PM to 7:00 PM. There will be no Lane Closures on on the following dates of Local Special Events, July 3-12, July 24-26 & September 27. Davenport Construction 1-800262-5145. last updated June 19 |
| |
| Roadwork - US 71 |
US 71: from US 30 to IA 175 road construction, roadway reduced to one lane -- pilot car in operation — until July 24 Comment: Carroll County - On US 71 from one mile north of Carroll north to the east juction with Iowa 175 traffic will be reduced to on lane in work areas and traffic will be maintained with a pilot car operation. Cherokee RCE 1-800-579-2712 last updated June 24 |
| |
| Roadwork - US 218 |
US 218: from Exit 91: IA 1 to Exit 239: I-80 road construction, night time construction work, roadway reduced to one lane, width limit in effect Width limit 12 ' 0 " — until November 15 Comment: Johnson County: On US 218 north of Iowa 1, beginning April 20 until November 15, from 7:00 pm Sundays to 6:00 am Friday mornings, highway resurfacing will reduce traffic to one lane from Iowa 1 to the Junction of I-80. South of Ia. 1 to one mile south of Riverside Drive, traffic will be restricted to one lane during day light and night time hours also. No traffic restrictions will be enforced during U of I football game days. July 19 through 25 no restrictions will be in effect for Riverside Drive and ramp and loop closures will not be permitted at the Rvierside Drive Interchange. Width restriction 12 ft. NHSX-218-4 --3H-52 Cedar Rapids Field Office 1-319-365-6986 last updated April 20 |
| |
| Roadwork - US 218 |
US 218: between IA 116 and IA 3 road construction, exit ramp closed — until July 17 Comment: Bremer County. As part of the continuing paving work, the southbound exit ramp is closed at Exit 198 . Please obey signs and use caution when traveling through the work zone. New Hampton RCE Office - 800-373-7343. last updated June 29 |
| |
| Roadwork - Iowa 2 |
Iowa 2: at IA 5 road construction, roadway reduced to one lane, width limit in effect Width limit 14 ' 0 " — until September 25 Comment: Appanoose County: IA 5/2 intersection will be reconstructed starting with the northeast quadrant. Temporary traffic signals will be placed for each direction. Chariton RCE Office 1-800-881-5778. last updated June 30 |
| |
| Roadwork - Iowa 3 |
Iowa 3: from IA 38 to US 52 road construction, roadway reduced to one lane, width limit in effect -- look out for flaggers, pilot car in operation Width limit 10 ' 0 " — until September 25 Comment: Delaware County: Beginning May 1 on Hwy 3 from Ia. 38 to Hwy 52 in Luxemberg, traffic will be reduced to one lane through the work area using flaggers and a pilot car. The work will be done during daylight hours with the road returned to normal traffic each evening. Manchester RCE 1-800-262-5146 Project STP-3-8 --2C-28 last updated May 1 |
| |
| Roadwork - Iowa 16 |
Iowa 16: at IA 1 road construction, roadway reduced to one lane, width limit in effect -- look out for flaggers Width limit 11 ' 0 " on weekdays and Saturdays — until September 7 Comment: VanBuren County. HMA Pavement Widening and Resurfacing.This will go from the South Jct.with Ia. 1 easterly to the Jct. with County Road W46. There will be a 11 ft. width restriction and with lane closures with flaggers.Mt. Pleasant RCE.1-800-224-6021. last updated March 30 |
| |
| Roadwork - Iowa 24 |
Iowa 24: from US 18 to US 52 road construction, roadway reduced to one lane -- pilot car in operation, look out for flaggers — until October 5 Comment: Chickasaw County. Resurfacing work between New Hampton and Jackson Junction will include longitudinal subdrains, widening, milling, patching, and grading. Alternating lane closures will be necessary and traffic will be controlled with pilot cars and flaggers. Please use caution when traveling through the work zone. New Hampton RCE Office - 800-373-7343. last updated April 23 |
| |
| Roadwork - Iowa 57 |
Iowa 57: from County Road T55 to US 218 road construction, roadway reduced to one lane -- pilot car in operation, look out for flaggers — until July 17 Comment: Black Hawk/Grundy County. As part of the continuing road construction on IA 57 between New Hartford and Cedar Falls, resurfacing work will involve temporary lane closures. Traffic will be controlled with flaggers and pilot cars. Please use caution when traveling through the work zone. New Hampton RCE Office - 800-373-7343. last updated June 25 |
| |
| Roadwork - Iowa 76 |
Iowa 76: from IA 9 to County Road A16 road construction, roadway reduced to one lane -- pilot car in operation, look out for flaggers — until August 14 Comment: Allamakee County. As part of the continuing road construction on IA 76 between Waukon and Minnesota State Line, resurfacing and pipe extension work will involve temporary lane closures. Traffic will be contoled with flaggers and pilot cars. Please use caution when traveling through the work zone. New Hampton RCE Office -800-373-7343. last updated June 17 |
| |
| Roadwork - Iowa 130 |
Iowa 130 in both directions: from County Road Y52 to I-80 road construction, roadway reduced to one lane, shoulder closed, width limit in effect, delays Width limit 12 ' 0 " on weekdays and Saturdays — until November 28 Comment: Scott County, Asphalt Overlay and shoulder widening on IA 130, there will be random lane and shoulder closures. Davenport Construction, 1-800-262-5145 last updated May 28 |
| |
| Roadwork - Iowa 136 |
Iowa 136 in both directions: at US 67 bridge maintenance operations, night time construction work, roadway reduced to one lane, road closed intermittently, width limit in effect, delays -- look out for flaggers Width limit 12 ' 0 " daily — until July 30 Comment: Clinton County, Bridge Washing on IA 136 Mississippi River Bridge in Clinton. Davenport Construction 1-800-262-5145. last updated June 26 |
| |
| Roadwork - Iowa 143 |
Iowa 143: from IA 3; County Road L36 to IA 10 road construction, roadway reduced to one lane — until July 31 Comment: Cherokee County - One lane traffic will be maintained with a pilot car because of intermittant lane closures as contractor works the 10.77 mile project. Cherokee RCE 1-800-579-2712. last updated June 15 |
| |
| Roadwork - Iowa 415 |
Iowa 415: from County Road R6F to before County Road R6F road construction, night time construction work, roadway reduced to one lane — starting 7:00 PM, 07/06/09 until September 15 Comment: This patching project is on IA 415. Work hours will be from 7 pm Sunday night to 6 am Friday morning. There will be a lane closure up while patching is being completed, however no lane closures will be up outside of patching hours. Des Moines Construction Greg Mulder 1-800-251-2707 last updated June 26 |
| |
| Road Restrictions - US 275 |
US 275: after I-29 height limit in effect Comment: Height limit of 8' at Veterans Memorial Bridge. Vehicles over 8' high must use alternate route. last updated June 12 |
| |
| Roadwork - US 61 |
US 61 in both directions: from US 6 to I-80 construction work, roadway reduced to two lanes -- observe speed limits, drive carefully Comment: Project for the City of Davenport being done by Hawkeye Paving will reduce US 61 to two lanes periodically through the summer at the Intersection of US 61 and 65th Street in Davenport. Motorist should obey traffic control signing and devices, watch for Construction workers and equipment in this area, and Drive Carefully. Thank you for your cooperation. For questions call : Eric Schallert, Project Engineer for City of Davenport, 1-563-326-7729. last updated May 8 |
| |
| Roadwork - US 218 |
US 218: from IA 116 to IA 188 road construction, roadway reduced to two lanes — until July 17 Comment: Bremer County. As part of the continuing paving work, both southbound lanes are closed from just south of Waverly north to Co. Rd. C-33. Traffic will be running head to head in the northbound lanes. Please use caution and obey signs when traveling through the work zone. New Hampton RCE Office - 800-373-7343. last updated June 29 |
| |
| Roadwork - Iowa 26 |
Iowa 26: at IA 9 long term road construction, lane closed, shoulder closed -- look out for flaggers — until September 1 Comment: Allamakee County. Road construction work between Lansing and New Albin will include adding several box culvert extensions. Shoulder closures and short term lane closures with minor delays will be necessary. Traffic will be controlled with flaggers and traffic signals. Please use caution when traveling through the work zone. New Hampton RCE Office - 800-373-7343. last updated April 3 |
| |
| Roadwork - Interstate 29 |
Interstate 29 southbound: from Exit 10: IA 2 to Exit 32: US 34; IA 978 road construction, bridge construction — until August 18 Comment: Mills County. This is a reconstruction of a south bound bridge approximately four miles north of exit 24, the Bartlett Exit. The traffic will be head-to-head in the north bound lanes. The traffic will be separated with vertical tubular delineators. The Council Bluffs Resident Construction Engineer will administer this project. Phone 1-800-579-2719 last updated June 30 |
| |
| Roadwork - Interstate 29 |
Interstate 29: from Exit 10: IA 2 to Exit 32: US 34; IA 978 road construction — until November 16 Comment: Fremont County. The southbound lane will be closed. The north bound lane will be head to head traffic. The south bound lanes will be closed to construct new bridges and resurfacing of I-29 south bound. The head to head traffic will go from approximately mile marker 17 to mile marker 21. The Council Bluffs Resident Construction Engineer will administer this project. Phone 1-800-579-2719 last updated May 5 |
| |
| Roadwork - Interstate 29 |
Interstate 29: from Exit 61: I-680; County Road G37 to Exit 75: US 30 road construction, bridge construction — until November 2 Comment: Harrison County. This is a bridge widening and reconstruction project located 0.9 miles north of I-29 Exit 72, the Loveland interchange. One lane in both the north bound and southbound lanes will be closed. Traffic will be maintained through the construction zone in each direction with the use of temporary concrete barrier rail. The width in the open lane of traffic will be 14.5 feet. The Council Bluffs Resident Construction Engineer will administer this project. Phone: 1-800-579-2719 last updated April 23 |
| |
| Roadwork - Interstate 29 |
Interstate 29 southbound: from Exit 61: I-680; County Road G37 to Exit 71: I-680 road construction, bridge construction, width limit in effect Width limit 13 ' 0 " — until October 16 Comment: Pottawattamie County. This is a new bridge and approaches project in the south bound lane at approximately mile marker 66, which is 4.4 miles south of the north junction of I-29 and I-680.. The north bound lane will be head-to-head traffic with tubular markers to channelize traffic. The SB exit and entrance ramps at exit 66, Rosewood Rd., will be closed during this replacement of the Honey Creek bridge. The Council Bluffs Resident Construction Engineer will administer this project. Phone 1-800-579-2719 last updated April 9 |
| |
| Roadwork - Interstate 29 |
Interstate 29 northbound: at Exit 75: US 30 road construction Width limit 15 ' 0 " — until July 29 Comment: Harrison County. This is a bridge deck overlay project of the north bound bridge on I-29 over US 30 at the Missouri Valley Exit, exit 75. One lane traffic in the north bound lane will be maintained with the use of temporary concrete barrier rail to channel traffic across the bridge. Signing and additional channelizing devices will be use out side the bridge area for channeling vehicles through the construction zone. The Council Bluffs Resident Construction Engineer will administer this project. Phone 1-800-579-2719 last updated June 30 |
| |
| Roadwork - Interstate 29 |
Interstate 29 in both directions: from Exit 89: IA 127 to Exit 127: IA 141; County Road K42 road construction, width limit in effect Width limit 15 ' 6 " daily — until December 24 Comment: Woodbury County . Traffic will be reduced one 15' 6" lane on Interstate 29 from south of Little Sioux north to north of Onawa for PCC concrete paving. Sioux City RCE. 1-800-579-2713. last updated May 14 |
| |
| Roadwork - Interstate 29 |
Interstate 29 in both directions: from Exit 148: US 77 to Exit 151: IA 12; Riverside Boulevard road construction, width limit in effect Width limit 14 ' 6 " daily — until December 20 Comment: Woodbury County. Traffic will be reduced to one 14.5' lane in each direction on I-29 for grading and paving from north of Riverside Blvd. north to the South Dakota State Line.Sioux City RCE 1-800-579-2713. last updated May 4 |
| |
| Roadwork - Interstate 35 |
Interstate 35: from after Exit 22 County Road J14 to before Exit 34 Clay Street and County Road H33 road construction, bridge construction, opposing traffic sharing the roadway — until November 20 Comment: Clarke County: Switching to head-to-head traffic on I-35 northbound lanes from Decatur County line north to just north of US 34. Chariton RCE 1-800-881-5778. last updated May 5 |
| |
| Roadwork - Interstate 80 |
Interstate 80 in both directions: from Exit 225: US 151; County Road W21 to Exit 240: IA 965; Coral Ridge Avenue road construction, night time construction work — Comment: Iowa/Johnson County night time road construction both directions on mainline. Daytime ramp work. last updated May 28 |
| |
| Roadwork - Interstate 80 |
Interstate 80: from Exit 240: IA 965; Coral Ridge Avenue to before Exit 242 1st Avenue road construction, width limit in effect Width limit 11 ' 0 " — until September 4 Comment: Johnson County: On I-80 between milepost 240 to milepost 242 , all traffic is routed onto the eastbound lanes for reconstruction of the westbound lanes, until September 4, 2009. The available lane width for both directions is 11 ft. with 2 ft. shoulders. Expect delays. Westbound traffic on I-80 is scheduled to be restricted to one lane, from exit 240 through exit 242, starting tomorrow night. The restriction is necessary for switching traffic onto the new ramp pavement at those exits and will be in effect from 7:00 pm to 7:00 am, Wednesday and Thursday nights, and again on Monday and Tuesday night next week. Project IM-080-6 240--13-52 Manchester Construction Office 1-800-262-5146 last updated June 23 |
| |
| Roadwork - Interstate 80 |
Interstate 80: from after Exit 254 County Road X30 to before Exit 267: IA 38; County Road X54 road construction, night time construction work, width limit in effect Width limit 14 ' 0 " — starting 7:00 PM, 07/06/09 until September 18 Comment: Cedar County: Night time work from 7:00 pm to 6:00 am Monday evening through Friday morning, and from 9:00 pm on Sundays to 6:00 am on Mondays beginning July 6, 2009 on I-80 from milepost 257.6 to 265.7 road resurfacing work will cause one lane to be closed in either direction through the work zone. Width limit 14 ft with 10 ft. paved outside and 6 ft. paved inside shoulders. Project IMX-80-7 258--02-16 Manchester RCE 1-800-262-5146 last updated July 1 |
| |
| Roadwork - Interstate 380 |
Interstate 380 in both directions: from Exit 16: US 30; US 151 and US 218 to Exit 35 County Road W36 road construction, width limit in effect, night time construction work Width limit 14 ' 0 " on Mondays, Tuesdays, Wednesdays and Thursdays — until July 31 Comment: Traffic on I-380, from US 30 north to the Center Point interchange, will be reduced to one lane in either direction through the work zones. The restriction will be in effect from 7:00 pm to 6:00 am, Monday through Friday mornings. Manchester RCE phone 1-800-262-5146 Project Number IMN-380-6 17--0E-57 last updated June 22 |
| |
| Roadwork - US 18 |
US 18 in both directions: from US 75 to IA 60 road construction, width limit in effect Width limit 16 ' 6 " on weekdays — until November 7 Comment: Sioux County. Traffic will be reduced to one 16.5' lane controlled by flaggers and a pilot for HMA resurfacing with patching on US 18 from Hull to Sheldon. Sioux City RCE 1-800-579-2713. last updated June 3 |
| |
| Roadwork - US 20 |
US 20 in both directions: from County Road K42 to County Road D22 road construction, width limit in effect Width limit 16 ' 6 " daily — starting 6:30 AM, 07/07/09 until August 30 Comment: Woodbury County. Traffic will be reduced to one 16.5' lane in each direction for PCC Patching on US 20 from Lawton to the end of the 4-lane east of Moville. Sioux City RCE Office 1-800-579-2713. last updated June 30 |
| |
| Roadwork - US 30 |
US 30: at US 59 road construction -- look out for flaggers — until July 30 Comment: Crwford County - over the Boyer River 2.5 miles south of Denison traffic may be delayed briefly by intermittent work on the shoulders during daylight hours. Cherokee RCE 1-800-579-2712 last updated June 26 |
| |
| Roadwork - US 30 |
US 30: at US 59 road construction -- look out for flaggers — until July 30 Comment: Crawford County - 4 miles west of Denison traffic may be briefly delayed by intermittent work on the shoulders during daylight hours. Cherokee RCE 1-800-579-2712 last updated June 26 |
| |
| Roadwork - US 30 |
US 30: at US 59 road construction -- watch, look out for flaggers — until July 30 Comment: Crawford County - in the City of Denison over the East Boyer River traffic may be briefly slowed by intermittent work on the shoulders during daylight hours. Cherokee RCE 1-800-579-2712 last updated June 26 |
| |
| Roadwork - US 30 |
US 30 in both directions: between County Road P46 and County Road P54 bridge construction, road construction -- watch daily — until September 12 Comment: Greene County Work has began for an onsite detour, replacement of existing bridge between X Ave and Y Ave on Highway 30 approx. 2.6 miles east of Grand Junction, IA . Grading to take approx 3 weeks to complete onsite detour, depending on weather. Traffic will be diverted to detour when completed Contractor Graves Constr. of Spencer contact Jefferson RCE 1-800-251-2705 last updated June 12 |
| |
| Roadwork - US 34 |
US 34: at I-35 bridge construction — until November 1 Comment: Clarke County: Switching to head-to-head traffic in the westbound lanes on US 34 over I-35. Chariton RCE Office 1-800-881-5778. last updated April 13 |
| |
| Roadwork - US 59 |
US 59: at US 30 road construction -- look out for flaggers — until July 30 Comment: Crawford County - 2.1 miles south of U.S. 30 traffic may be briefly slowed by intermittent work on shoulders during daylight hours. Cherokee RCE 1-800-579-2712 last updated June 26 |
| |
| Roadwork - US 65 |
US 65 in both directions: from IA 3 to County Road C31 road construction -- detour in operation — until November 6 Comment: Franklin County. PCC Pavement - Grade/Replace work on US 65 from IA 3 north to 19th Avenue in Hampton. Detour in operation. Traffic will be routed west one mile on IA 3 to Olive Avenue then north 2 miles to 170th Street then back east to US 65. District 2. Britt Construction Office. Roy A. Gelhaus 1-800-373-7344. STP-065-7 - -2C-35 last updated June 19 |
| |
| Roadwork - US 65 |
US 65 southbound: from after IA 122 to before County Road B20 bridge construction Width limit 14 ' 0 " — until October 1 Comment: Cerro Gordo County. Bridge Replacement on southbound US 65 over the Winnebago River 0.6 miles north of Mason City. Traffic will be head-to-head in the northbound lanes. Britt Construction Office 1-800-373-7344. Roy A. Gelhaus BRFN-065-8 - -39-17 last updated May 8 |
| |
| Roadwork - US 65 |
US 65 in both directions: between IA 122 and County Road B20 bridge construction — until October 20 Comment: Cerro Gordo County. Bridge Replacement. County Road 310th Street will be closed until June 5, 2009 for detour construction. Britt Construction Office. Roy A. Gelhaus 1-800-373-7344 BRF-065-8 - -38-17 last updated May 19 |
| |
| Roadwork - US 65 |
US 65 in both directions: from IA 9 to after County Road A34 road construction -- pilot car in operation Width limit 14 ' 0 " — until July 17 Comment: Worth County. PCC Patching and sub drain work on US 65 from IA 9 in Manly north to Co. Rd. 105 in Northwood. Pilot car in operation. Britt Construction Office. Roy A. Gelhaus 1-800-373-7344 STP-065-9 - -2C-98 last updated June 4 |
| |
| Roadwork - US 67 |
US 67 southbound: from I-74 to I-80 construction work, right lane closed Comment: McCarthy Construction Company will be working on the new entrance to Scott Community College and will have periodic lane closures on HWY 67 southbound at mile marker 7.0 in the right lane through out the summer. Motorist should watch for construction workers and equipment, obey traffic control signing and devices, and drive carefully in this area. Thanks for your cooperation. last updated May 11 |
| |
| Roadwork - US 69 |
US 69: from after IA 160 to before County Road F22 road construction, width limit in effect Width limit 11 ' 0 " — until August 1 Comment: This project is in the town of Ankeny from N 18th St north to north of N 36th St. This involves grading and paving of 2 lanes with the southbound lanes closed and traffic going head to head in the northbound lanes. Usual work days are Mon-Fri with Sat work possible. Des Moines Construction Greg Mulder 1-800-251-2707 last updated June 11 |
| |
| Roadwork - US 69 |
US 69: from IA 175 to before County Road D41 road construction -- pilot car in operation, look out for flaggers Width limit 12 ' 0 " on weekdays and Saturdays — until August 15 Comment: Hamilton Co. HMA Resurfacing Project will start April 6, 2009 weather permitting Mathy Constr. of WI Jefferson RCE 1-800-251-2705 last updated March 12 |
| |
| Roadwork - US 71 |
US 71 in both directions: from I-80 to IA 44 road construction, width limit in effect Width limit 16 ' 0 " — until August 3 Comment: Cass Co., Creston Construction 800-579-2720, Traffic is restricted to one lane in each direction on US 71 at the Intersection of US 71 and I-80. Starting Monday, June 8 thru June 10, the contractors will be having to stop traffic for short periods of time, 10-15 minute periods, in order to place beams for new bridge construction. last updated June 3 |
| |
| Roadwork - US 75 |
US 75 in both directions: from County Road C70 to County Road C38 bridge construction, width limit in effect Width limit 11 ' 0 " daily — until September 18 Comment: Plymouth County. NB and SB lanes of US 75 will be narrowed to 11' width for bridge deck overlay just north of Hinton. Sioux City RCE Office.1-800-579-2713. last updated June 19 |
| |
| Roadwork - US 151 |
US 151: from I-80; County Road W21 to US 6 road construction, night time construction work — Comment: Iowa/Johnson County night time work on mainline both directions. Daytime ramp work. last updated May 28 |
| |
| Roadwork - Iowa 1 |
Iowa 1: at I-80 bridge construction Width limit 9 ' 0 " — until August 21 Comment: Johnson County, Right lane closure in both directions on bridge on IA 1 over I-80. Width restriction 9' at the bridge. last updated May 29 |
| |
| Roadwork - Iowa 2 |
Iowa 2: at US 59 road construction — until August 7 Comment: Fremont County. This is a bridge deck overlay project. It is the bridge over the East Nishnabotna River located approximately four mile west of the US 59 and IA 2 intersection on IA 2. One lane will be closed during construction. Traffic will be controlled with the use of temporary traffic signals. Temporary concrete barrier rail will channel traffic through the work zone. The traffic lane width accross the bridge will be 19.0 feet. The Council Bluffs Resident Construction Engineer will administer this project. Phone: 1-800-579-2719 last updated April 1 |
| |
| Roadwork - Iowa 7 |
Iowa 7 in both directions: from County Road P19 to US 169 road construction -- pilot car in operation, look out for flaggers Width limit 12 ' 0 " on weekdays and Saturdays — until August 14 Comment: Calhoun - Webster County HMA Project to begin on April 13, 2009 weather permitting pilot car in operation from .5 miles west of Calhoun county line east to US169 Jefferson RCE 1-800-251-2705 last updated April 14 |
| |
| Roadwork - Iowa 14 |
Iowa 14: at US 34 bridge construction, width limit in effect Width limit 14 ' 0 " — until October 16 Comment: Lucas County: Bridge construction on IA 14 over US 34 in Chariton. Width limit of 14 feet. Chariton RCE Office 1-800-881-5778. last updated June 5 |
| |
| Roadwork - Iowa 17 |
Iowa 17: from after County Road E18 to before IA 175 road construction -- pilot car in operation, look out for flaggers Width limit 12 ' 0 " on weekdays and Saturdays — until August 15 Comment: Boone County HMA Resurfacing will start approx. June 16, 2009 Weather permitting from County Rd E-18 to IA Hwy 175 Mathy Construction Co of WI Jefferson RCE 800-251-2705 last updated June 3 |
| |
| Roadwork - Iowa 39 |
Iowa 39: at US 59 road construction -- watch, look out for flaggers — until July 30 Comment: Crawford County - over Buffalo Creek 1.3 miles north of U.S. 59 traffic may be slowed by intermittent work on the shoulders during daylight hours. Cherokee RCE 1-800-579-2712 last updated June 26 |
| |
| Roadwork - Iowa 39 |
Iowa 39: at US 59 road construction -- look out for flaggers — until July 30 Comment: Crawford County - at Spangler Creek 12.1 miles north of U.S. 59 traffic may be briefly slowed by occasional shoulder work during daylight hours. Cherokee RCE 1-800-579-2712 last updated June 26 |
| |
| Roadwork - Iowa 44 |
Iowa 44: from US 59 to IA 173 road construction -- pilot car in operation, look out for flaggers — until September 30 Comment: Shelby County. This is a Hot Mix Asphalt Resurfacing type project. One lane will be closed during the daylight hours. Traffic control will be with the use of flaggers and pilot cars through the work zone areas. The Council Bluffs Resident Construction Engineer will administer this project. Phone number 1-800-579-2719 last updated June 1 |
| |
| Roadwork - Iowa 83 |
Iowa 83: from US 59 to IA 173 road construction -- pilot car in operation, look out for flaggers — until October 15 Comment: Pottawattamie County. This is a Hot Mix Asphalt widening and resurfacing project. One lane will be closed during the day light hours. Traffic control will be with the use of flaggers and pilot cars through the work zone areas. The Council Bluffs Resident Construction engineer will administer this project. Phone number: 1-800-579-2719 last updated June 1 |
| |
| Roadwork - Iowa 92 |
Iowa 92 in both directions: between IA 70 and County Road G40 bridge construction, width limit in effect Width limit 12 ' 6 " on weekdays and Saturdays — starting 7:00 AM, 07/07/09 until August 31 Comment: Louisa County. Bridge Approach Repairs. This bridge is located in the city of Columbus Jct. There will be work on each end of the bridge and will cause one lane to be closed. Traffic in the area will be guided by temporary traffic signals.Mt. Pleasant RCE.1-800-224-6021. last updated July 1 |
| |
| Roadwork - Iowa 141 |
Iowa 141 in both directions: from IA 31 to IA 175 road construction, width limit in effect Width limit 16 ' 0 " on weekdays — until November 13 Comment: Monona County. Traffic will be reduced to one 16' lane during working hours controlled by flaggers and a pilot car for snow borrow improvements along IA 141 from the Woodbury County Line southeast to west of Mapleton.Sioux City RCE 1-800-579-2713. last updated April 17 |
| |
| Roadwork - Iowa 141 |
Iowa 141: at US 59 road construction -- look out for flaggers — until July 30 Comment: Craford County - 3.2 miles west of U.S. 59 traffic may be delayed briefly by intermittent work on the shoulders during daylight hours. Cherokee RCE 1-800-579-2712 last updated June 26 |
| |
| Roadwork - Iowa 175 |
Iowa 175: from after US 169; County Road P61 to before IA 17 road construction -- pilot car in operation, look out for flaggers Width limit 12 ' 0 " on weekdays and Saturdays — until August 15 Comment: Webster Boone Hamilton Co. HMA Resurface Project will start April 6, 2009 Weather permitting Mathy Constr. of WI Jefferson RCE 1-800-251-2705 last updated March 12 |
| |
| Roadwork - Iowa 175 |
Iowa 175: from IA 17 to US 69 road construction -- pilot car in operation, look out for flaggers Width limit 12 ' 0 " on weekdays and Saturdays — until August 15 Comment: Hamilton Co. HMA Resurface Project will start April 6, weather permitting Mathy Construction of WI Jefferson RCE 1-800-251-2705 last updated March 12 |
| |
| Roadwork - Iowa 187 |
Iowa 187: at IA 3 road construction — until July 20 Comment: Fayette County - Construction of a roundabout intersection at IA 187 and IA 3 will include an on-site runaround for IA 3 traffic and the north leg of IA 187. The south leg of IA 187 will be closed and will be detoured on Co. Rds. C64 and W45. Please follow detour signs and use caution when traveling through the work zone. New Hampton RCE Office - 800-373-7343. last updated May 11 |
| |
| Road Restrictions - US 20 |
US 20: between County Road N65 and County Road P13 gross weight limit in effect No vehicles over 80000 lbs Comment: Calhoun County - 40 ton maximum weight limit - bridge over West Cedar Creek, 5.3 miles east of Rockwell City. last updated March 25 |
| |
| Road Restrictions - US 30 |
US 30 in both directions: between US 63 and County Road E66 height limit in effect Height limit 18 ' 0 " — Comment: Tama County. New bridge over existing Highway 30 located 1/2 mile East of the US 63 intersection at Mile Post 203.1 has a height restriction of 18' 0". Marshalltown RCE Office 1-800-251-2706 last updated June 30 |
| |
| Road Restrictions - US 34 |
US 34: from after Exit 191: US 63 to before County Road V37 height limit in effect Height limit 19 ' 2 " Comment: Opening of new highway section at US 34 affecting US 34 traffic both eastbound and westbound. This restriction is near 97th street and Old Agency Road west of Agency approximately 1 mile. last updated March 31 |
| |
| Road Restrictions - US 34 |
US 34: between Exit 191: US 63 and County Road V37 height limit in effect Height limit 18 ' 1 " Comment: Opening of new highway section at US 34, and County Road V37 also known as the Hedrick-Agency Road. Traffic on US 34 both eastbound and westbound affected by the new vertical height restriction due to single bridge for County Road V37 over US 34. last updated October 12 |
| |
| Road Restrictions - US 71 |
US 71: from after County Road D54 to before County Road D54 height limit in effect Comment: Sac County - Permanent height restriction of 17 feet 7 inches at railroad crossing between these two county roads. Cherokee RCE 1-800-579-2712 last updated October 7 |
| |
| Road Restrictions - US 218 |
US 218 in both directions: between County Road W64 and County Road G36 height limit in effect Height limit 16 ' 0 " daily Comment: Washington County. This is a new bridge going over Hwy 218. Mt. Pleasant RCE. Jeffrey Johnson. 1-800-224-6021. last updated November 3 |
| |
| Road Restrictions - Iowa 2 |
Iowa 2: after US 61 gross weight limit in effect No vehicles over 16000 lbs Comment: Weight restriction is for Mississippi River toll bridge from Fort Madison, IA to Niota, IL last updated February 23 |
| |
| Road Restrictions - Iowa 2 |
Iowa 2: after US 61 width limit in effect Width limit 8 ' 0 " Comment: Lee County - Permanent Width Limit last updated December 8 |
| |
| Road Restrictions - Iowa 12 |
Iowa 12: from after IA 376 to before I-29 truck restrictions in force No vehicles over 80000 lbs Comment: Woodbury County - 40 ton weight on Gordon Street Viaduct in Sioux City. Bridges & Structures Office: 1-800-262-0003 ext 1725 last updated March 25 |
| |
| Road Restrictions - Iowa 16 |
Iowa 16: at US 34; County Road V43 height limit in effect Height limit 17 ' 3 " Comment: Opening of new highway section at US 34, IA 16 and County Road V-43 Height restriction is for both eastbound and westbound traffic for IA Highway 16 crossing under the bridge to get to US 34 ramps. No restriction for traffic on US 34. last updated October 12 |
| |
| Road Restrictions - Iowa 141 |
Iowa 141: between County Roads N36 and N33 and County Road N70 gross weight limit in effect No vehicles over 80000 lbs — Comment: Carroll County - Only one truck may cross at a time. last updated June 9 |
| |
| Alert - US 69 |
US 69 in both directions: at County Road R72 festival — starting 8:00 AM, 07/11/09 until July 11 Comment: Detour on US 69 northbound traffic from Jct of US 69 and Park Street, north on Park Street to North 3rd Ave. then east to US 69. Southbound traffic from Jct. of North 3rd Ave. and US 69 west to Park Street on Park Street south to US 69 last updated yesterday at 8:06 AM CDT |
| |
| Road Restrictions - Iowa 122 |
Iowa 122 eastbound: between County Road S34 and US 65 gross weight limit in effect No vehicles over 80000 lbs Comment: Cerro Gordo County - 40 ton weight limit 3.5 miles West of Jct. of U.S. 65 over Willow Creek. Bridges & Structures Office: 1-800-262-0003 ext 1725 last updated March 25 |
| |
| Road Restrictions - Iowa 140 |
Iowa 140: at County Road C66 gross weight limit in effect No vehicles over 80000 lbs Comment: Plymouth County - 40 ton weight limit at entrance bridge located 3.8 mi. N. of Kingsley. Bridges & Structures Office: 1-800-262-0003 ext 1725 last updated March 25 |
| |
| Road Restrictions - US 34 |
US 34 eastbound: from after US 63 to before Exit 191: US 63 height limit in effect Height limit 16 ' 10 " Comment: New Height Limit on new Eastbound US 34 under new US 34/63 Bridge Height restricted to 16'10" last updated November 19 |
| |
| Road Restrictions - US 34 |
US 34: from after IA 906 to before Exit 210 IA 904 height limit in effect Comment: on US 34 west of Fairfield Height limit of 17' Mt. Pleasant RCE 1-800-224-6021 last updated August 18 |
| |
| Road Restrictions - US 63 |
US 63 northbound: from US 34 to US 34 height limit in effect Height limit 21 ' 0 " Comment: New Height Limit on new US 63 under US 34 Bridges Northbound Height restricted to 21''1" last updated November 19 |
| |
| Road Restrictions - US 63 |
US 63 southbound: from US 34 to US 34 height limit in effect Height limit 16 ' 10 " Comment: New Height Limit on new US 63 Southbound under US New 34/63 Bridge Height restricted to 16'10" last updated November 19 |
| |
| Road Restrictions - US 63 |
US 63 northbound: from Exit 191: US 34 to Exit 191: US 34 height limit in effect Height limit 25 ' 4 " Comment: New Height Limit on new US 63 under Bladensburg Road Bridge Northbound Height restricted to 25''3" last updated November 19 |
| |
| Road Restrictions - US 63 |
US 63 southbound: from Exit 35 100th Street and Pensylvania Avenue to Exit 35 100th Street and Pensylvania Avenue height limit in effect Height limit 18 ' 4 " Comment: New Height Limit on new US 63 under Dahlonega Road Bridge Southbound Height restricted to 18'4" last updated November 19 |
| |
| Road Restrictions - US 169 |
US 169: between IA 141 and County Road E57 gross weight limit in effect No vehicles over 80000 lbs Comment: Dallas County - Permanent Weight Limit - All Vehicles. Location on US Highway 169 - 2.9 miles south of junction 141. 1-800-262-0003 ext 1290 last updated April 24 |
| |
| Road Restrictions - US 275 |
US 275: after I-29 gross weight limit in effect No vehicles over 10000 lbs Comment: Pottawattamie County, 5 ton weight limit on US 275, IA 92, over the Missouri River in Council Bluffs. Bridges & Structures Office: 1-800-262-0003 ext 1725. last updated March 25 |
| |
| Road Restrictions - Iowa 1 |
Iowa 1: from after US 34 to before County Road H43 height limit in effect Height limit 16 ' 11 " Comment: Jefferson County Hwy 1 just south of Fairfield vertical clearance of 16'-9" Mt. Pleasant RCE 1800-224-6021 last updated March 5 |
| |
| Road Restrictions - Iowa 9 |
Iowa 9: between County Road X20 and IA 26 gross weight limit in effect No vehicles over 80000 lbs Comment: Allamakee County - 40 ton weight limit over Mississippi River Bridge in Lansing. Bridges & Structures Office: 1-800-262-0003 ext 1725 last updated March 25 |
| |
| Road Restrictions - Iowa 122 |
Iowa 122: between County Road S34 and US 65 gross weight limit in effect No vehicles over 80000 lbs Comment: Cerro Gordo County - 40 ton weight limit Over Chelsea Creek, located 1.2 mi. W. of jct. with US 65. Bridges and Structures Office: 1-800-262-0003 ext 1725 last updated March 25 |